Shireoaks Top Lock (42) and Shireoaks Middle Lock (43) – October 10th to 14th

May Gurney on behalf of British Waterways will be partially dewatering the canal pound between Locks 42 and 43 (Shireoaks Top Lock and Shireoaks Middle Lock).
This essential work will enable grouting to be carried out, stopping leakage through the lock structure from causing damage and saving precious water

BW:
Turnerwood Double Bottom Lock (34), Quarry Lock (35) and Turnerwood Top Lock (36) – October 12th to 14th

British Waterways will be partially dewatering the canal pounds between Locks 34, 35 and 36 for three days. This should enable investigation of the ground paddle chamber to determine the extent of pressure grouting requirements. This investigation is required prior to a major works scheme at this site during 2012.

speak!

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s